We at Kannur Budget Home just started the 1st floor concrete beam of our client safa’s project. It is a private dwelling consisting of 1781 sqft.
With our experienced & hardworking team, we bring success to each project. The concrete floor slab construction process includes material preparation, erection of formwork, placement of reinforcement, pouring, compacting, and finishing concrete, and lastly removal of formwork and curing of a concrete slab.
The formwork is designed to withstand construction loads such as fresh concrete pressure and the weight of workers and operators and their machines. Formwork in construction is used to support structures and act as molds to create structures out of concrete which is poured into the molds.
The next step includes reinforcement.
Reinforcement should be accurately placed and adequately supported before concrete is placed, and should be secured against displacement.