Working Progress of new project of Kannur Budget Home

Kannur Budget Homes

05 April 2022

No Comments

We at Kannur Budget Home just started the 1st floor concrete beam of our client safa’s project. It is a private dwelling consisting of 1781 sqft.

With our experienced & hardworking team, we bring success to each project. The concrete floor slab construction process includes material preparation, erection of formwork, placement of reinforcement, pouring, compacting, and finishing concrete, and lastly removal of formwork and curing of a concrete slab.

The formwork is designed to withstand construction loads such as fresh concrete pressure and the weight of workers and operators and their machines. Formwork in construction is used to support structures and act as molds to create structures out of concrete which is poured into the molds.

The next step includes reinforcement.

Reinforcement should be accurately placed and adequately supported before concrete is placed, and should be secured against displacement.

Then we mix the concrete with appropriate ingredients. The mixed concrete is transported to the site of concreting within the initial set time. Then the concrete finish involves creating a smooth surface using screeds & trowels.

The last step in this process involves curing of concrete, which is a process of keeping the concrete moist to enable it to gain full strength.

We completed this 1st floor Concrete work with our excellent construction team.  Our coordination & communication at Kannur Budget Home make our each project success.